桃色视频 completed an upgrade for SFMTA鈥檚 central server room including seismic strengthening and HVAC power upgrades. Special construction precautions were taken to ensure that the transportation system鈥檚 automatic control was not disturbed. Although the project duration required a quick turn-around, the coordination of these efforts were very important to the success of the task.